Overview & Technical SpecificationA unique opportunity, comprising two plots available for lease.
Plot 1
A purpose built 17,200 sqm, 315 bay EV Charging Hub (EVCH), delivered as a surface-level scheme.
- Number of EV bays
- 315
- Fixed power connection
- 1.1 MVA
- Facilities
- Guard hut, welfare
- Type of charger
- 22kW AC
- Charging bay size
- 6.5m x 3.0m
- Bicycle storage
- N/A
- Driver aisle width
- 7m
- Access & security
- 24/7
Plot 2
A purpose built EVCD on a 7,600 sqm site, comprising 40 EV charging bays and an 1,800 sqm depot with 40 staff parking bays.
- Number of EV bays
- 40
- Depot clear height
- 8.0m
- Bicycle storage
- N/A
- Driver aisle width
- 7m
- Access & security
- 24/7
- Office content
- 10-15%
- HGV yard
- 35m with 2 dock level doors
- HGV charger
- 150-400kW
- EPC
- N/A
- Bay size
- 6.5mm x 3.0m
- Fixed power connection
- 0.6MVA
- Type of charger
- 22kW AC bays
- Depot load bearing floors
- 50 kN/m2
- Depot size
- 1,800
- Site circulation
- 360°
- LCV loading
- Cross-dock
- BREEAM
- Very good
- Solar
- Roof mounted array
Location
Located less than 15 minutes from Amsterdam, Westpoort and Haarlem, the site provides direct access to Schiphol Airport and the surrounding road network.
The area’s expanding logistics network reinforces its role as a premier hub for distribution and fleet operations, ensuring seamless supply chain execution.
- N205
- 0.5 km
- 2 mins
- A5
- 6 km
- 6 mins
- A9
- 3 km
- 4 mins
- N200
- 6 km
- 7 mins
- A8
- 17 km
- 15 mins
- A2
- 8 km
- 20 mins
- A10
- 16 km
- 16 mins
- N201
- 18 km
- 16 mins
- A1
- 29 km
- 26 mins
- Haarlem
- 9 km
- 12 mins
- Westpoort
- 10 km
- 14 mins
- Schiphol Airport
- 12 km
- 12 mins
- Amsterdam-Zuid
- 20 km
- 18 mins
- Amsterdam-Noord
- 27 km
- 25 mins
- Amsterdam-Oost
- 25 km
- 25 mins