Overview & Technical Specification
Opportunity comprises two plots:
Plot 1: a purpose built EVCH on a 17,200 sqm site, with 315 EV charging bays configured as a surface-level scheme.
Include EVCH Technical Specification table
Plot 2: a purpose built EVCD on a 7,600 sqm site, comprising 40 EV charging bays and an 1,800 sqm depot with 40 staff parking bays.
Include EVCD Technical Specification table
- Number of EV bays
- 355 (Plot 1: 315, Plot 2: 40)
- Charging bay size
- 6.5m x 3.0m
- Fixed power connection
- 1.7 MVA
- Type of charger
- 22kW AC
- Clear head height
- 8m (Plot 2 depot)
- Depot GLA
- 1,800 sqm
- HGV loading docks
- 2
- Access & security
- 24/7
- Facilities
- Guard hut, welfare (WCs & showers)
- BREEAM
- Very Good
Location
Located less than 15 minutes from Amsterdam, Westpoort and Haarlem, the site provides direct access to Schiphol Airport and the surrounding road network.
The area’s expanding logistics network reinforces its role as a premier hub for distribution and fleet operations, ensuring seamless supply chain execution.
- N205
- 0.5 km
- 2 mins
- A5
- 6 km
- 6 mins
- A9
- 3 km
- 4 mins
- N200
- 6 km
- 7 mins
- A8
- 17 km
- 15 mins
- A2
- 8 km
- 20 mins
- A10
- 16 km
- 16 mins
- N201
- 18 km
- 16 mins
- A1
- 29 km
- 26 mins
- Haarlem
- 9 km
- 12 mins
- Westpoort
- 10 km
- 14 mins
- Schiphol Airport
- 12 km
- 12 mins
- Amsterdam-Zuid
- 20 km
- 18 mins
- Amsterdam-Noord
- 27 km
- 25 mins
- Amsterdam-Oost
- 25 km
- 25 mins